Search Merrimon Comments by Name


Download PDF

707kb PDF Document of all comments.

2018 Merrimon Widening Comment Database

April: Proposed design does not incorporate active transportation standards and best practices for safety

From: April Brown
Date: Mon, Jan 29, 2018 at 10:41 PM
Subject: NCDOT Merrimon Widening Project Asheville
To: kbereis@hntb.com

Dear Kim,

I am writing regarding the NCDOT Merrimon Avenue Widening Projects U-5781, U-5782 Initial Designs. The proposed designs must be re-evaluated given several issues with the initial designs. I urge NCDOT’s Division 13 to partner with the City of Asheville’s (COA) Transportation Department and incorporate existing COA plans into NCDOT planning. Several existing COA plans were not incorporated into NCDOT’s proposed Merrimon improvements (e.g. Asheville in Motion, Asheville CIty 2025 Plan, etc).

Additionally, the proposed design does not incorporate active transportation standards and best practices for safety. Please see the American Association of State Highway and Transportation Officials (AASHTO) guidelines and standards pertaining to active transportation infrastructure. I urge you to work with active transportation content experts, such as Asheville on Bikes, to incorporate best practices and that prioritizes public safety.

Thank you,

April Brown